Generation

Enerpeixe

Peixe Angical HPP 
Location: Tocantins
Installed Capacity: 498.8 MW
Physical Guarantee: 280.5 average MW
Concession Maturity: November, 2036
Initiation of Operations: 2006
Proportional to EDP Energias do Brasil’s stake: 60%

Energest

Mascarenhas HPP 
Installed Capacity: 198.0 MW
Physical Guarantee: 134.8 average MW
Concession Maturity: July 2025
Initiation of Operations: 1974
Proportional to EDP Energias do Brasil’s stake: 100%

EDP PCH

Suíça HPP 
Installed Capacity: 35.3 MW
Physical Guarantee: 18.9 average MW
Concession Maturity: July 2025
Initiation of Operations: 1965
Proportional to EDP Energias do Brasil’s stake: 100%

Rio Bonito SHPP 
Installed Capacity: 22.5 MW
Physical Guarantee: 9.4 average MW
Concession Maturity: July 2025
Initiation of Operations: 1959
Proportional to EDP Energias do Brasil’s stake: 100%

São João SHPP 
Installed Capacity: 25.0 MW
Physical Guarantee: 13.0 average MW
Concession Maturity: May 2029
Initiation of Operations: 2007
Proportional to EDP Energias do Brasil’s stake: 100%

Fruteiras SHPP 
Installed Capacity: 8.7 MW
Physical Guarantee: 5.6 average MW
Concession Maturity: July 2025
Initiation of Operations: 1912
Proportional to EDP Energias do Brasil’s stake: 100%

Jucu SHPP 
Installed Capacity: 4.8 MW
Physical Guarantee: 2.6 average MW
Concession Maturity: July 2025
Initiation of Operations: 1909
Proportional to EDP Energias do Brasil’s stake: 100%

Viçosa SHPP 
Installed Capacity: 4.5 MW
Physical Guarantee: 2.5 average MW
Concession Maturity: May 2029
Initiation of Operations: 2001
Proportional to EDP Energias do Brasil’s stake: 100%

Alegre SHPP 
Installed Capacity: 2.1 MW
Physical Guarantee: 1.2 average MW
Concession Maturity: July 2025
Initiation of Operations: 1920
Proportional to EDP Energias do Brasil’s stake: 100%

Santa Fé

Francisco Grós SHPP 
Installed Capacity: 29.0 MW
Physical Guarantee: 15.6 average MW
Concession Maturity: November 2031
Initiation of Operations: 2009
Proportional to EDP Energias do Brasil’s stake: 100%

Investco / Lajeado

Luis Eduardo Magalhães HPP 
Location: Tocantins
Installed Capacity: 902.5 MW
Physical Guarantee: 505.1 average MW
Concession Maturity: January 2033
Initiation of Operations: 2001
Proportional to EDP Energias do Brasil’s stake: 73%

Porto do Pecém I TPP

Porto do Pecém I TPP 
Location: Ceará
Installed Capacity: 720.3 MW
Physical Guarantee: 645.3 average MW
Concession Maturity: July 2043
Initiation of Operations: December 2012

Santo Antônio do Jari HPP 

Santo Antônio do Jari HPP 
Location: Between Pará and Amapá State
Installed Capacity: 393.0 MW
Physical Guarantee: 222.0 average MW
Concession Maturity: December 2044
Initiation of Operations: since 2015
Proportional to EDP Energias do Brasil’s stake: 50%

Cachoeira Caldeirão HPP

Cachoeira Caldeirão HPP 
Location: Amapá
Installed Capacity: 219.0 MW
Physical Guarantee: 129.7 average MW
Concession Maturity: December 2048
Initiation of Operations: Schedule to 2017
Proportional to EDP Energias do Brasil’s stake: 50%

São Manoel HPP

São Manoel HPP 
Location: between Mato Grosso and Pará State
Installed Capacity: 700 MW
Physical Guarantee: 424.5 average MW
Concession Maturity: April 2049
Initiation of Operations: Schedule to 2018
Proportional to EDP Energias do Brasil’s stake: 33.33%

Distribuition

EDP São Paulo

Concession Area: 28 municipalities in the state of São Paulo, specifically those in the region of the Upper Tietê, Paraíba Valley and Northern Sea-Board, a total area of 9.6 thousand Km²
Client Base: 1.8 million invoiced customers
Population in the Concession Area: 4.6 million
Customer Profile (2017): residential 25%, industrial 49%, commercial 17%, rural 1% and others 8%
Volume of Distributed Energy in 2017 (captive and free): 14,854 GWh
Concession Maturity: October 2028

EDP Espírito Santo

Concession Area: 70 of the 78 cities of the Espirito Santo State, area of  41.2 thousand sq km
Client Base: 1.5 million of costumers
Population in the Concession Area: 3.8 millions
Clients Profile (2017): residential 24%, industrial 41%, commercial 18%, rural 8% and others 9%
Volume of Distributed Energy in 2017 (captive and free):  9,850 GWh
Concession Maturity: July 2025

Commercialization

EDP Comercializadora

Commercialized Energy in 2017: 17,804 GWh.

Responsible for EDP Energias do Brasil’s commercialization activities and the fourth largest private sector energy commercializing company in Brazil according to the CCEE.

EDP Grid

Acquisition in December 2015.

The APS Energy Solutions is a leading Brazilian companie dedicated to energy conservation service. Energy- efficiency projects and energy quality recognized by the most important industry awards, the company has led business solution to more than 600 customers in the industrial , commercial, rural and public service.

In 2017, EDP Grid executed projects involving 75 consumer units and 3 energy conversion (Natural Gas to Biomass) projects, resulting in total savings of 51 GWh and a reduction of 30,305 tCO2 in pollutant gases, strengthening the Group’s social and environmental commitment. In the solar energy segment, focused on distributed generation and dedicated self-production projects, EDP Grid closed 2017 having contracted 10.74  MWp and with a robust pipeline of projects

Transmission

Transmission

The Company won the Lot 24 in the Second Stage of the Transmission Auction No. 013/2015, organized by ANEEL. 

LOT 24

Location: Espírito Santo
Lenght: 113 Km
Concession Maturity: February 2047
Operation Start-Up: 2020

The Company won Lots 7, 11, 18 and 21 in the Transmission Auction No. 05/2016, organized by ANEEL.

LOT 7

Location: Maranhão
Lenght: 121 Km
Concession Maturity: August 2047
Operation Start-Up: 2022

LOT 11

Location: Maranhão
Lenght: 203 Km
Concession Maturity: August 2047
Operation Start-Up: 2021

LOT 18

Location: between São Paulo and Minas Gerais
Lenght: 375 Km
Concession Maturity: August 2047
Operation Start-Up: 2022

LOT 21

Location: between Santa Catarina and Rio Grande do Sul
Lenght: 485 Km
Concession Maturity: August 2047
Operation Start-Up: 2022

Last updated on
Top

Quotes

edp Brasil

R$

Real

ENBR3

Ativo
52 weeks
  • R$ … MIN.
  • R$ … MAX.

IBOVESPA

IBOV

Índice
52 weeks
  • MIN.
  • MAX.

IEE

IEE

Índice
52 weeks
  • MIN.
  • MAX.