The variation in fixed assets amounted to R$ 611.6 million in 2Q19 and R$ 1,069.4 million in 6M19, 184.7% and 209.3% higher than 2Q18 and 6M18, respectively, in both periods excluding investments in Santo Antônio do Jari, Cachoeira Caldeirão and São Manoel HPPs. The amounts were distributed among the segments as follows: transmission (69.7%), distribution (27.2%), generation (2.3%) and others (0.7%).

R$ Million By segment (%)
Variation in Fixed Assets (R$ thousand) 2Q19 2Q18    Var. %
Distribution 129,192 147,043 -12.1%
Generation  12,389 37,485 -66.9%
Generation Others 5,534 16,133 -65.7%
Santo Antonio do Jari HPP(1)  78 45 72.3%
Cachoeira Caldeirão HPP(1) 564 371 52.0%
São Manoel HPP(2) 6,214 20,936 -70.3%
Transmission 473,217 50,609 835.1%
Others 3,654 1,005 263.6%
Total 618,452 236,142 161.9%

(1) Considers EDP participation = 50% 
(2) Considers EDP participation = 33.3%

Generation

Variations in the segment's fixed assets amounted R$ 12.4 million in 2Q19 and R$ 34.1 million in 6M19, down 66.9% and 60.1%, respectively, reflecting the allocation of investments for the construction of São Manoel in 6M18.

Variation in Fixed Assets (R$ thousand) 2Q19 2Q18 Var. %
Enerpeixe 730 1,836 -60.2%
Energest 250 307 -18.6%
EDP PCH - 1,270 -100.0%
Lajeado / Investco 946 894 5.8%
Pecém 3,608 11,816 -69.5%
Santa Fé - 10 -100.0%
Generation Consolidated 5,534 16,133 -65.7%
Santo Antonio do Jari HPP 78 45 72.3%
Cachoeira Caldeirão HPP 564 371 52.0%
São Manoel HPP 6,214 20,936 -70.3%
Total (pro forma) 12,389 37,485 -66.9%

Distribution

Investments in the distribution segment were R$ 129.2 million in 2Q19 and R$ 291.4 million in 6M19, a decrease of 12.1% and an increase of 15.8%, respectively. In the quarter, a total of R$ 70.3 million was invested at EDP São Paulo, and R$ 58.9 million at EDP Espírito Santo, a variation of +6.0% and -27.7%, respectively.

Out of total gross investments 42.0% were allocated to metering systems, expansion of lines, substations and distribution grids for connecting new customers, 30.8% went to grid improvements, replacement of equipment and meters, both obsolete and depreciated, as well as the reconductoring of grid networks at the end of their useful life, 17.1% went to telecommunications, information technology and other activities such as infrastructure and commercial projects, and 10.1% was invested in loss reduction.

Transmission

The segment received investments of R$ 473.2 million in 2Q19 and R$ 744.9 million in 6M19, reflecting construction works, territorial studies and engineering projects in the lots acquired in the auction nº 05/2016. To date, around 29% of the total contracted capex has already been executed.

Variation in Fixed Assets | Annualy (R$ million)

Note: considers the participation of EDP Brasil on HPPs Jari, Cachoeira Caldeirão and São Manoel.

*Investments refers to the variation of the fixed assets in the period.

1) According to CPC 19 (R2) and (IFRS 11)
2) Do not consider capitalized interest

 
Last updated on
Top

Quotes

edp Brasil

R$

Real

ENBR3

Ativo
52 weeks
  • R$ … MIN.
  • R$ … MAX.

IBOVESPA

IBOV

Índice
52 weeks
  • MIN.
  • MAX.

IEE

IEE

Índice
52 weeks
  • MIN.
  • MAX.